Protecting Repair Putty from Edge Stress and Peeling

Corners are where repairs die first. Adhesive failure overwhelmingly initiates at sharp edges because they act as stress concentrators — any mechanical load, thermal movement, or shrinkage force applied to the repair focuses intensely at that narrow boundary, fatiguing the bond until it peels away from the substrate. Why Sharp Edges Concentrate Stress A 90-degree transition between putty and metal creates a geometric discontinuity that multiplies local stress far beyond the nominal load applied to the joint. Finite-element studies of adhesive lap joints consistently show peak stress at the bond termination running several times higher than the average stress across the bonded area — which is exactly why peel failures start at a corner and propagate inward rather than initiating in the middle of a repair. Every mitigation strategy below exists to reduce that local stress multiplication, not to make the putty itself stronger. Geometric Stress Management Through Filleting The single most effective fix is eliminating the sharp edge entirely. Shaping the putty into a smooth, concave fillet where it meets the metal — rather than a squared-off 90-degree termination — distributes mechanical load and internal stress over a substantially larger area, preventing the stress peak from concentrating at one vulnerable point. Beyond the fillet itself, the repair's perimeter should taper gradually down to a thin, feathered edge blending into the surrounding metal; an abrupt, thick edge is far more fatigue-prone than a gently tapered one. It's also worth watching torque during reassembly near a repaired area — over-tightening fasteners close to the putty introduces high, localized tensile stress that concentrates precisely at the sharpest corners, triggering the micro-fractures that start a peel. Preparing the Edge for a Durable Anchor The bond at the edge has to be strong enough to withstand the peeling forces concentrated there. Surface abrasion should extend well beyond the boundary the putty will actually cover, so the material bonds to rough, prepared metal past the point where forces are highest rather than terminating right at the stress peak. For defects running to a corner, a subtle undercut or inward chamfer at that corner changes the geometry so that any cure shrinkage pulls the putty into the corner rather than away from it — creating a mechanical lock that actively resists the peeling motion instead of just resisting it passively. Deep mechanical keying, in the form of a V-groove or chamfer that runs right up to and slightly around the corner, anchors the repair structurally enough that a small surface peel can't easily propagate into a full bond failure. Application Technique to Prevent the Peel from Starting A flawless bond right at the edge prevents most peel failures before they begin. Vigorous scrubbing with a stiff spatula, working the putty directly into the corner and along the entire edge perimeter first, ensures the material wets out the prepared surface completely and penetrates every microscopic anchor point where stress will be highest. Sufficient consolidation force during application matters just as much — air voids near the surface,…

Comments Off on Protecting Repair Putty from Edge Stress and Peeling

Addressing Poor Performance in Thin Joints with Repair Putty

A joint that's too tight can be just as troublesome as one that's too wide. When repair putty is squeezed into a very thin gap, there's simply not enough material volume left to carry shear, peel, or tensile loads — a failure mode known as a starved joint, and it's one of the more counterintuitive problems in structural bonding. Understanding Why Thin Bond Lines Fail Every repair putty has a minimum effective bond-line thickness below which its rated strength simply doesn't apply, typically somewhere between 0.005 and 0.010 inches depending on the formulation and filler content. Squeeze a joint tighter than that minimum and the putty can't develop the internal cohesive strength the manufacturer's data sheet is based on — the joint behaves more like a thin adhesive film prone to brittle cracking than a load-bearing gap fill. This is a real constraint, not a conservative safety margin: independent lap-shear testing per ASTM D1002 on metal-filled epoxies consistently shows strength dropping off sharply once bond-line thickness falls below the formulation's design range. Preparing the Joint for Minimum Thickness The goal is enough material volume without excessively widening the gap the assembly was designed around. For joints that are already mated, aggressively roughening both surfaces with a coarse 40- to 60-grit abrasive before assembly creates the depth and surface area the putty needs to mechanically key into, effectively increasing bond-line volume without opening the external gap. Where the joint is tighter than the manufacturer's recommended minimum, a controlled fix is worth considering: light micro-abrasion on one mating surface can eliminate metal-to-metal contact and leave just enough consistent space for the putty, or temporary shims — 0.010-inch plastic or wire spacers placed around the joint perimeter during assembly — can hold a minimum gap open and then be removed before final cure. Application Techniques That Actually Fill Thin Gaps Getting material into a thin joint reliably takes more than spreading it on and clamping down. Wet out both surfaces first. Apply a thin layer of mixed putty to both mating faces and vigorously scrub it in with a rigid spatula before assembly. This drives the material into every micro-cavity created by the abrasion step and ensures a genuine chemical bond to both sides, not just one. Control the clamping force. Bring the joint together and let excess putty flash out at the edges, removing it while still soft. Maintain steady, even pressure with clamps or fasteners throughout cure — but stop short of over-clamping to the point the joint is squeezed back down to a starved, near-metal-to-metal condition. Use capillary action on open seams. Where the joint is an accessible edge rather than a fully mated pair, apply putty at the seam and let moderate pressure and capillary flow pull it into the gap gradually. Forcing material in too fast traps air that later shows up as a void. Reinforcing the Joint Externally Even a well-prepared thin joint benefits from added protection on the outside. After the primary bond cures, a small…

Comments Off on Addressing Poor Performance in Thin Joints with Repair Putty

Strategies for Machining and Finishing Cured Repair Putty

The same hardness that makes a metal-filled repair putty durable is exactly what makes it miserable to finish. Once fully cured, these compounds are engineered to approach the hardness of cast iron or steel, which means the easy part of the repair is already over by the time sanding begins. Controlling the Application to Minimize Excess The fastest material to finish is the material that was never applied in the first place. Feathering the putty into the defect during application, using a spatula to taper it onto the sound metal, dramatically cuts down on post-cure grinding. A controlled, slight overfill — enough to account for cure shrinkage but not a heaping mound — avoids hours of unnecessary work on a fully hardened, abrasion-resistant composite. On flat surfaces or precise edges, a tape dam, wooden block, or metal straight edge held in place during application lets excess material be scraped away while the putty is still soft, removing the need to machine it later. Working the "Green State" Before Full Hardness The window between initial set and full cure — the "green state" — is the single best opportunity to shape metal-filled putty with minimal tooling. During this period the material has firmed up enough to hold its shape but can still be sliced with a sharp cabinet scraper, chisel, or blade. Shaving in this state takes a fraction of the time that grinding fully cured material requires, and it produces far less dust and heat. Timing is the variable that matters most here: too early and the material smears instead of cutting cleanly; too late and it has already reached a hardness that dulls hand tools. Most metal-filled epoxy putties reach a workable green state within 20 to 45 minutes at room temperature, though cooler ambient conditions extend that window. Machining Fully Hardened Putty Once cured, treat the material as a metal-polymer composite rather than a plastic. Standard high-speed steel tooling dulls quickly against metal-filled putty; carbide-tipped or solid-carbide bits are necessary for clean cuts through drills, end mills, or lathe work. For bulk removal, grinding with an 80- to 120-grit flap disc outperforms sanding, but because the putty typically grinds faster than the surrounding metal, pressure should stay focused on the repair itself and feather off across the metal to avoid gouging a recess. Wet sanding or wet grinding extends abrasive life, cuts down on airborne dust, and helps keep the workpiece cool during finishing. Drilling or milling should run at a slower cutting speed than solid metal calls for — the putty generates heat quickly under a dull or fast-spinning tool, which can soften the resin matrix and gum up the cutting edge rather than shearing cleanly. For questions on which grade of Incure's Epo-Weld™ epoxy putty machines best for a given hardness target or section thickness, Email Us with the application details. Achieving a Flush, Cosmetic Match The final pass determines whether the repair reads as a repair. A fine-grit abrasive — 220-grit or higher — on…

Comments Off on Strategies for Machining and Finishing Cured Repair Putty

Avoiding Surface Curing with Soft Core in Thick Putty Fills

A repair that looks flawless on the outside can still be structurally worthless underneath. When repair putty is packed into a deep void, the surface layer often forms a hard "skin" while the material beneath stays soft, tacky, or under-cured — a defect that only becomes obvious when the patch fails weeks later. Why the Core Stays Soft While the Surface Skins Over Two-part repair putties cure through an exothermic reaction: the resin and hardener release heat as they cross-link. In a thin layer, that heat dissipates quickly into the surrounding air and metal. In a thick mass, the heat has nowhere to go — it builds up in the core while the surface, which is in direct contact with cooler ambient air, actually cures more slowly than the insulated interior at first, then reverses as trapped heat eventually overheats the core polymer and shortens its usable working life before the network fully develops. The result is a repair with a hard, sandable shell and a rubbery or chalky interior with a fraction of its rated compressive and shear strength. This is a mass-effect problem, not a formulation defect, and it shows up on virtually every metal-filled epoxy putty regardless of brand once section thickness exceeds roughly 3/4 inch (19 mm) in a single application. Controlling the Exothermic Reaction The fix starts with how the material is mixed and placed, not with the putty itself. Staged layering (thin lifts): Build the repair in successive lifts of 1/2 inch (12 mm) to 3/4 inch (19 mm), letting each layer reach a "green," partially cured state before the next goes on. This lets heat escape between layers instead of accumulating. Small-batch mixing: Mix only what the current lift needs. A larger mass generates more heat on its own, which shortens working time and accelerates surface skinning before the batch is even placed. Spread to dissipate heat: If a larger batch is unavoidable, flatten it against a cool, non-porous plate (aluminum or steel) immediately after mixing. Increasing surface area lets heat escape before the skin forms. Optimizing the Curing Environment and Application Environmental control matters as much as technique. Performing the repair at the cooler end of the manufacturer's specified temperature range slows the reaction rate and reduces peak exotherm, giving heat more time to distribute evenly through the section. Setting the part on a large, cool metal heat sink during cure pulls heat away from the underside, and simple air circulation around the repair keeps the surface from radiating heat back into itself. Application technique also affects the outcome. Trapped air pockets act as insulators inside the fill, so firm, repetitive tamping to consolidate the material is essential — a void at the core prevents heat from conducting outward and creates a permanent soft spot. Resist the urge to speed things along with a heat gun or lamp immediately after placement; external heat accelerates only the surface reaction and widens the gap between skin and core cure rates. If a post-cure heat…

Comments Off on Avoiding Surface Curing with Soft Core in Thick Putty Fills

Preventing Bond Failure Under Vibration and Mechanical Shock

When repair putty is used on components subjected to vibration, repeated impact, or sudden mechanical shock, the bond line experiences rapid, cyclic stress that can quickly lead to fatigue and a loss of adhesion. The rigid nature of many structural putties makes them particularly vulnerable to this kind of dynamic loading, which behaves very differently from the steady compressive loads putty tolerates well. Enhancing the Mechanical Keying Since vibration and shock generate powerful shear and tensile forces, the bond has to be anchored mechanically, not just chemically, to survive. For repairs under dynamic stress, surface roughness needs to be maximized — 40- to 60-grit abrasives create deep, random scratch patterns that the putty fills, turning the bond into a dense network of mechanical anchors resistant to being pulled or sheared out under repeated shock. For cracks, the prepared V-groove should be as deep as structurally possible, since the steep walls of the groove ensure that any separating force, tensile or shear, transfers immediately to the large surface area of the groove walls rather than concentrating at a single point. Cleanliness matters more here than in almost any other failure mode: any thin film of contamination absorbs vibration like a tiny, sacrificial layer between the metal and the putty, and that layer fatigues and fails quickly under shock. Perfect, residue-free degreasing is non-negotiable for genuine shock resistance. Structural Reinforcement and Load Transfer The primary strategy for vibration and shock is to prevent the dynamic load from reaching the putty bond line directly at all. If the repair sits on a structural member, the load needs to be carried by the metal, not the putty. Steel pins, screws, or bolts installed before the putty is applied, bridging the defect, bear the vast majority of the static and dynamic load, leaving the putty to serve as a robust seal and structural filler around the anchors rather than the primary load path. For thin-walled components — sheet metal or thin castings — a metal backing plate bonded or bolted to the opposite side of the component over the defect stiffens the repair zone, reducing the flexure that would otherwise rapidly crack a rigid putty under repeated impact. As with other loading scenarios, sharp 90-degree corners act as stress concentration points that amplify the effects of vibration and shock — always transition the putty smoothly with a radius or fillet where it meets the metal, dispersing dynamic energy away from the critical bond line edge. Reducing Vibration at the Source The best defense against vibration-driven failure is eliminating or reducing the vibrational energy that reaches the component in the first place. Inspecting the machinery or assembly and introducing or replacing rubber isolators, bushings, or resilient mounts that connect the repaired component to the rest of the assembly absorbs vibration before it ever gets to the repaired area, dramatically reducing the cyclic load the putty bond has to withstand. If the vibration source is an imbalance, such as a rotating shaft or wheel, re-balancing the component…

Comments Off on Preventing Bond Failure Under Vibration and Mechanical Shock

Mitigating Chemical Incompatibility and Degradation in Putty Repairs

When using repair putty on metal, chemical incompatibility is a real and often underestimated risk. The putty's own components — particularly metallic fillers and hardeners — can interact with the substrate metal in ways that lead to galvanic corrosion or a compromised bond, and the risk rises sharply when repairing dissimilar metals, such as a steel fastener embedded in an aluminum casting. Preventing Galvanic Corrosion Between Dissimilar Metals Galvanic corrosion occurs when two dissimilar metals are in electrical contact — often via a conductive putty — and are exposed to an electrolyte such as moisture. One metal, the anode, sacrifices itself to protect the other, leading to rapid, localized failure right at the repair. The most critical countermeasure is to electrically isolate the dissimilar metals from each other. While the putty's own composition can't be changed, a barrier can still be introduced: if a repair involves, say, an aluminum casting with a steel bolt or insert, apply a thin, non-metallic, high-performance primer or coating specifically designed as a barrier layer to the contact area before applying the conductive repair putty. This breaks the electrical circuit between the two metals and stops the galvanic cell before it can form. For especially sensitive metals like aluminum, where contamination or conductivity is a real concern, an electrically non-conductive grade of putty can also serve as an isolating layer between the sensitive metal and a metal-filled repair compound elsewhere in the assembly. Beyond isolation, surface cleaning matters directly: the repair area needs to be perfectly clean of external contaminants such as salts, acidic residues, or moisture that could act as the electrolyte driving a galvanic reaction, and a final degrease with acetone is a critical step in preventing that. Managing Surface Coatings and Chemical Reactions The putty needs to bond directly to sound, bare metal — never to a chemical coating that could react with it or simply fail underneath it. Structural putty should never be applied over primers, anodization, galvanization, or paint; these coatings need to be completely removed down to bare, bright metal through abrasion, since they can react with the putty's own chemistry or, more commonly, simply lose their own adhesion to the substrate and take the putty with them when they let go. Cleaning agent choice matters here too: some cleaning agents, especially acidic or caustic ones, can leave behind an invisible residue that reacts with the putty's hardener, leading to a weak or incomplete cure. Only neutral, volatile solvents like acetone or isopropyl alcohol should be used for the final wipe, ensuring no residue remains behind to interfere with the chemistry. Post-Cure Protection Against Ongoing Chemical Exposure Even a well-bonded repair can fail if it's continuously exposed to harsh chemicals or a corrosive environment after cure. Once the putty has fully cured, an external protective topcoat — an industrial-grade epoxy paint or a dedicated polymer sealant — applied over the entire repaired area seals the porous surface of the cured putty from moisture, chemicals, and electrolytes, preventing the environmental…

Comments Off on Mitigating Chemical Incompatibility and Degradation in Putty Repairs

Preventing Delamination After Repeated Thermal Cycles

Delamination — the peeling or separation of cured putty from the metal substrate at the bonded interface — is a common failure mode in repairs subjected to repeated heating and cooling. The mechanism is straightforward: a mismatch in the coefficient of thermal expansion (CTE) between the putty and the metal introduces continuous, cyclic shear stress at the bond line every time the component cycles through temperature. Maximizing Bond Strength Through Preparation A bond that is genuinely stronger than the internal stresses induced by thermal cycling is far less likely to delaminate, and that strength starts with preparation, not the compound itself. Surface preparation is non-negotiable here. Any contaminant acts as a bond-breaker, so the surface must be perfectly clean, degreased, and aggressively abraded to a bright metal finish — around 40 to 80 grit roughness. The mechanical bond created by that roughness is crucial for resisting the shear forces generated by repeated expansion and contraction. Deep mechanical keying reinforces this further: V-grooving or chamfering the edges of a defect forces the putty to penetrate deeply and anchor itself into the substrate, so that when the metal and putty try to move at different rates, the mechanical interlock resists the direct peeling or shearing force at the bond line. Feathering the edges of the repair matters too, since delamination often begins at a sharp edge where stress concentrates — a gradual taper distributes the cyclic stress over a larger surface area instead of letting it peak at the perimeter. Managing Internal Stress Through Geometry The way the putty is applied can reduce the stress generated by CTE mismatch on its own, independent of the bond strength itself. Using the minimum effective thickness of putty matters: the thicker the putty, the greater the volume undergoing differential movement, which leads to higher internal stress, while a thinner bond line has less material mass pulling or pushing against the substrate. Never leave sharp 90-degree angles where the putty meets the metal — a fillet, a rounded internal corner, transitions smoothly from the repair to the substrate, since sharp angles act as stress concentrators that accelerate fatigue failure and delamination. Controlling the Thermal Environment How the putty is cured and first introduced to heat determines its long-term stability under thermal cycling. For high-temperature applications, post-curing is the final and most important step: fully cure the putty at the manufacturer's specified ambient temperature first, then gradually expose the repaired part to increasing temperature — in an oven, or via a controlled engine run. This controlled heating process fully cross-links the polymer and relieves residual stress, hardening the bond and significantly improving its resistance to thermal fatigue over its service life. Avoid immediately exposing a freshly cured repair to wide, rapid temperature swings; letting the component go through several mild thermal cycles, such as intermittent use, before full service operation helps the bond "settle" and further stress-relieve itself naturally, preparing it for the rigors of repeated cycling ahead. Why Delamination Progresses Faster Once It Starts Thermal-cycling delamination…

Comments Off on Preventing Delamination After Repeated Thermal Cycles

Sealing Hairline Cracks with Repair Putty

Sealing a hairline crack presents a unique challenge that a wider defect doesn't: the viscosity of most repair putty prevents it from penetrating the narrowest channels completely, leaving microscopic leak paths behind even after the visible surface looks sealed. Solving this means getting the putty, or a precursor agent, all the way to the full depth and length of the fine fissure — not just across its opening. Preparation for Maximum Access Before application, the goal is to maximize both the width and cleanliness of the crack's surface opening. While a true hairline crack is too narrow to properly V-groove, a mechanical widening pass still helps: use a fine-tipped rotary tool or a sharp, pointed scribe to very gently chase the crack along its entire length, creating a minute V-groove that's wider at the surface and lets putty or solvent actually enter. If the part is small enough and accessible, ultrasonic cleaning after this widening pass is highly effective at driving contaminants — old oil, solvents, dust — out of channels too fine for regular wiping to reach. Flushing the crack repeatedly with a low-viscosity, fast-evaporating solvent like acetone or IPA, letting capillary action draw it deep inside, and then blowing it out with clean, dry, low-pressure air removes what ultrasonic cleaning alone might miss. Low-Viscosity Application Techniques For putty to actually penetrate a hairline crack, its effective viscosity has to be momentarily reduced, or meaningful pressure has to be applied during application. A "wash coat" technique works well when the manufacturer's instructions allow it: mix the putty and immediately use a small amount to create a very thin layer, since the heat of mixing temporarily lowers its viscosity. Vigorously smear and scrub this thin, fresh putty into the crack with a stiff plastic spreader, aiming not to fill the crack outright but to wet out the interior surfaces with the lowest-viscosity material available. After the wash coat, apply the main putty fill using a rigid, flat-edged spatula and extreme, focused pressure, scraping across the crack at various angles — this physically forces the putty down into the narrow channel rather than letting it bridge over the opening. For non-critical parts, applying vibration immediately after application, such as placing the part on a running sander or near a small ultrasonic cleaner, momentarily lowers the material's internal friction and helps it settle and flow deeper before cure begins. Post-Cure Confirmation After curing, confirm the integrity of the seal before returning the component to service. If it's a vessel or pipe, a low-pressure test — around 5 psi of air pressure, or a mild vacuum — combined with a soapy-water leak-detection solution over the repair site is a fast, reliable check: no bubbles means the hairline crack is fully sealed. For critical, non-pressurized repairs, a dye penetrant test works instead — apply the liquid dye to the repair site, and if it wicks into the metal, the seal is incomplete and needs another pass. Why a Hairline Crack Rarely Stays a Single…

Comments Off on Sealing Hairline Cracks with Repair Putty

Managing Brittleness and Cracking in Rigid Putty Repairs

Many high-strength repair putties cure to a rigid, brittle state that's necessary for structural integrity — but that same rigidity becomes a liability the moment the underlying metal substrate experiences vibration, thermal expansion and contraction, or flexure. A brittle putty can't accommodate that movement, and the result is cracking, often starting as hairline fissures that eventually grow into full failure and a lost seal. Isolating the Repair from Movement The most effective solution is to ensure the repair area experiences minimal movement in the first place, rather than trying to make the putty tougher. If a component is subject to constant vibration, such as a machinery mount, introducing external vibration isolation or dampening elements — rubber mounts or isolators — into the assembly adjacent to the repair reduces the vibrational energy reaching the brittle repair itself. For long joints or seams in large structures prone to thermal movement, don't apply putty continuously along the full length. Instead, leave small, strategic expansion joints filled later with a non-brittle, flexible sealant designed to absorb movement; the rigid putty carries the strength, and the flexible sealant absorbs the movement. For sheet metal or thin components, a backer plate or structural brace bonded or bolted to the underside or opposite side of the repair stiffens the area, minimizing the flexing that would otherwise crack a rigid putty immediately. Optimizing the Repair Geometry The shape and depth of the putty greatly influence its ability to survive minor stress events without cracking. Avoid sharp internal corners — 90-degree angles in a filled groove concentrate stress and provide an easy starting point for a crack. Always round or fillet the internal transition where the putty meets the metal. Deep V-grooving, useful for adhesion, also distributes stress over a larger internal surface area: when the metal substrate moves, the mechanical lock forces stress across the entire bond interface rather than concentrating it at the surface edge, which resists crack initiation. Feathering the edges of the repair as thinly as possible into the substrate matters too — a thin feather edge is less stressed and less likely to crack than an abrupt, thick edge, and if a crack does start in the rigid center, feathering lets its energy dissipate harmlessly as it nears the thin perimeter. Post-Cure Stress Relief The initial exposure to movement after a rigid cure is when most brittle failures actually occur. Don't shock a freshly repaired component with immediate extreme temperature changes — introduce it to its operational heat or cold gradually over time, allowing the rigid putty and the metal substrate to adjust to their differing thermal expansion coefficients without inducing immediate, catastrophic internal stress. When reassembling components, ensure no excessive pre-load or torque is applied near the repair; over-tightening can immediately induce a high level of locked-in tensile stress that a brittle putty simply can't withstand, leading to stress-cracking before the component ever enters service. Always use appropriate torque specifications rather than tightening past the point that "feels secure." Reading the Crack Pattern…

Comments Off on Managing Brittleness and Cracking in Rigid Putty Repairs

Preventing Creep and Long-Term Deformation in Putty Repairs

A repair that holds its shape perfectly the day it's made can slowly bulge, thin out, or shift months later under a constant load it was never truly designed to carry alone. That gradual, permanent deformation under sustained stress is called creep, and for polymeric repair putties it is a critical failure mode in joints bearing a continuous load — structural members, pressurized lines, or support components. Eliminate or Bypass Continuous Load The most effective way to prevent creep is to ensure the putty is never the primary load-bearing element in the joint or repair. If a repair is under constant tensile or shear load, that stress needs to be transferred to the metal substrate directly. Mechanical reinforcement — bolts, metal stitching plates, or internal pins that bridge the defect — carries the actual load, leaving the putty to function only as a seal and filler around the load-bearing elements. In a bolted flange repair, the bolts themselves should bear the load and maintain the gap, not the cured putty; the putty should be compressed but not subjected to continuous, high-shear stress on its own. For a filled cavity, preparing the geometry so the putty is mechanically locked in a way that converts external load into a compressive force on the putty, rather than a tensile or shear force, matters a great deal — putties are significantly stronger and more creep-resistant under compression than under tension. Managing the Cure and Operating Environment Temperature is a major accelerator of creep, since higher temperatures soften the polymer and make it deform more easily under stress. Ensuring the putty is fully and properly cured, including any recommended post-cure heating cycles, matters directly: a fully cross-linked polymer matrix resists creep far better than a partially cured one, and the post-cure process raises the material's glass transition temperature (Tg), letting it maintain rigidity under load at higher operating temperatures. Where the load itself is unavoidable, reducing the component's temperature in the repair area helps meaningfully — even a 10°C reduction can noticeably slow the rate of creep, and techniques like heat shielding or improved local airflow can achieve that reduction. Never subject the putty to its maximum mechanical load while it is also at its maximum operating temperature, especially right after cure — introduce load and heat gradually rather than simultaneously. Controlling Thickness and Geometry The shape of the repair influences stress distribution and, in turn, susceptibility to creep. Use the minimum effective thickness: thick sections of polymer are more prone to creep than thin bond lines, since the bulk material has less surface area contact with the rigid metal substrate to restrain its movement. Spreading the load over the largest possible area of the rigid substrate — by feathering the repair edges and overlapping the defect significantly — decreases the stress per unit area the putty experiences, which reduces the driving force behind creep. As with other loading failure modes, use radii and fillets rather than sharp 90-degree corners in the repair geometry, since…

Comments Off on Preventing Creep and Long-Term Deformation in Putty Repairs